In some instances, you may only require a temporary connection to our water main, such as for a temporary construction site or compound.
Alternatively you may need a Stand Pipe Licence to draw water from a hydrant in our area.
Application
1. Select a retailer
Select retailer and include an application.
2. Application
Submit your application.
3. Confirmation
We confirm we received everything.
4. Design, survey & cost
We work on the design, survey and cost.
5. Cost advice & proceed
We send cost advice. Tell us if you want to proceed.
Payment and request your connection
1. Forms & payment
To proceed, return your completed forms and make payment.
2. Send photographs
Send us photographs of your pipework.
We confirm if your installation meets the requirements.
4. Planning team
Your application is passed to our planning team.
Planning
1. Application review
Our planning team checks your installation details.
2. Propose an installation date
We call you to propose an installation date.
3. Notify your retailer
Notify retailer of the connection date.
4. Works permit and conditions reviewed
We review the works permit and conditions.
5. Confirm date
We will confirm the installation date.
Installation
1. Site visit
We may visit the site before installation.
2. Team arrives
Our team arrives on site to start digging.
3. Installation
Pipes and meters installed, then our team leaves site.
4. Reinstatement
If required we will return to carry out a reinstatement.
5. Billing & switching
You will be billed by your retailer.